Bell Place
Project Overview
The structure was originally assessed at 7.5 t, but Surrey County Council required it to support up to 40 t of traffic loading. The installation of CFRP plates provided the ideal solution, delivering a strong, durable, and efficient method to meet the increased load requirements.
Solution
Installed carbon-reinforced plates manufactured and supplied by Sika, which were bonded to the structure using a high-performance Sika epoxy adhesive to enhance load capacity and structural integrity.
Materials Used
- Sika carbon-reinforced plates
- High-performance Sika epoxy adhesive